SSi is pleased to announce that another SSi artificial lift system has been successfully installed. The latest installation took place in Egypt on Dec. 16, 2017 and brings the total number of worldwide installations to over 1300.
SSi is committed to optimization and improving efficiency in oil and energy production, and passes along the truly Canadian value of responsible energy development to the rest of the world. SSi’s innovative Model 250 (75hp, 240in stroke length) unit was deployed from Calgary, AB, Canada and installed in Egypt’s Western desert for an Egypt-based production company. The SSi Lift System design provides the client with increased safety and greater production capability.
SSi would like to extend a special thank-you to our channel partner EMC for their assistance throughout the installation process. In addition, SSi’s very own Steven McNeil and Dr. Ghareeb were also present to ensure the success of this project.