Oklahoma City, USA – September 2017. Sure Stroke Intelligent Lift Systems (SSi), a Tundra Process Solutions Company, presents a technical paper to the ALDRC Conference on the longest stroke and highest capacity Reciprocating Sucker Rod Pumping Systems. Dr Mohamed Ghareeb (Vice President, Eastern Hemisphere) and Alvin Woo (Mechanical Engineer P.Eng) were the co-presenters.
SSi has responded to market demand for intelligent, ultra long-stroke artificial lift equipment capable of increased oil production at reduced operating costs. SSi has completed design and construction of the longest stroke-length artificial lift system in the world.